Boat Rigging Checklist

Complete setup guide for optimal boat rigging. Ensure perfect crew performance with systematic oar setup, seat adjustments, and safety checks for rowing coaches and riggers.

🔧 Standard Rigging Specifications

Spread
84-86cm
Distance from centerline to pin
Height
17-19cm
Oarlock above seat level
Pitch
4-6°
Oarlock face angle
Inboard
115-118cm
Handle to oarlock distance
Footrest
42-45cm
Height from seat top
Overlap
15-18cm
Blade clearance between rowers

🔍Pre-Rigging Inspection

  • Inspect hull for damage, cracks, or stress points
  • Check rigger bolts and tighten if necessary
  • Verify all seat tracks are clean and properly lubricated
  • Test footrest adjustments and locking mechanisms
  • Inspect oarlocks for wear and proper alignment
  • Check cox box mount and wiring if applicable
  • Verify bow ball is secure and undamaged
  • Ensure all tools and measuring equipment are available

⚙️Rigging Setup

  • Set spread (distance from centerline to oarlock pin)
  • Adjust height (oarlock height above seat)
  • Set pitch (angle of oarlock face)
  • Configure inboard length (handle to oarlock)
  • Adjust footrest height and angle
  • Set seat position and backstop
  • Check overlap (blade clearance between rowers)
  • Verify span (distance between port and starboard pins)

🚣Oar Configuration

  • 🔧Match oar lengths to crew requirements
  • 🔧Check blade condition and repair if needed
  • 🔧Verify collar position and secure tightly
  • 🔧Test oar balance and adjust if necessary
  • 🔧Ensure proper blade pitch alignment
  • 🔧Check grip tape condition and replace if worn
  • 🔧Verify oar identification numbers are visible
  • 🔧Match oar pairs for consistent feel

🛡️Safety Checks

  • 🛡️Test cox box and communication system
  • 🛡️Verify heel restraints are properly adjusted
  • 🛡️Check that all nuts and bolts are properly tightened
  • 🛡️Ensure rigger wings are secure and aligned
  • 🛡️Test seat movement through full range of motion
  • 🛡️Verify oarlocks open and close smoothly
  • 🛡️Check that no sharp edges are exposed
  • 🛡️Confirm emergency procedures are understood

👥Crew-Specific Adjustments

📏Measure and record crew heights and weights
📏Adjust footrest positions for each rower
📏Set individual seat positions based on reach
📏Configure oar lengths for crew anthropometrics
📏Adjust rigger heights for rowing style
📏Set pitch based on crew technique level
📏Record all settings for future reference
📏Test full stroke motion with crew seated

Final Systems Check

Complete systems test with crew in boat
Verify cox can communicate with all rowers
Check boat balance with crew aboard
Test emergency stop procedures
Confirm all adjustments are locked in place
Document final rigging settings
Brief crew on any setup changes
Ensure backup equipment is available

🏗️ Rigging Best Practices

📐
Precision
Measure twice, adjust once. Small changes make big differences.
📋
Documentation
Record all settings for consistency and future reference.
🔄
Iteration
Fine-tune based on crew feedback and performance data.

Interactive Rigging Checklist

Progress0/48
0% Complete

Pre-Rigging Inspection

Rigging Setup

Oar Configuration

Safety Checks

Crew-Specific Adjustments

Final Systems Check

Track Rigging Impact with CrewSpeed

Use CrewSpeed to measure the impact of your rigging changes on crew performance. Track speed improvements, monitor stroke efficiency, and record audio notes about how different setups affect your crew's rowing. Perfect for validating rigging adjustments.